Distribution & logistics
Tilt-up and pre-engineered warehouses to 40' clear height, ESFR sprinklers, dock packages.
Distribution centers, manufacturing plants, transit depots and utility infrastructure. Self-performed concrete and steel, delivered with a 0.42 TRIR.
Building for public, private and industrial clients, including
On an industrial site, the safest crew is also the fastest. We track leading indicators daily and publish the lagging ones on every gate.
Days without a lost-time incident
Six sectors where we self-perform the critical path: concrete, steel erection and site civil.
Tilt-up and pre-engineered warehouses to 40' clear height, ESFR sprinklers, dock packages.
Process-ready plants with heavy slabs, crane rails and clean utilities.
Bus depots, maintenance facilities, public works yards and operations centers.
Substations foundations, pump stations and battery storage pads.
Short-span bridges, culverts, retaining walls and site infrastructure.
Freezer and cooler buildings with insulated slabs and vapor control.
| Scope | Delivery | Capability |
|---|---|---|
| Concrete | Self-performed | Foundations, tilt-up panels, slabs to FF 60 / FL 40 |
| Structural steel | Self-performed | Erection to 180 t per lift, bolting & welding |
| Site civil | Self-performed | Excavation, utilities, paving, stormwater |
| MEP | Trade partners | Pre-qualified, EMR below 0.8 required |
| Envelope | Trade partners | Insulated metal panel, roofing, glazing |
| Commissioning | In-house | Functional testing & O&M handover |
Our owners see the same programme as our superintendents, updated every shift.
Early numbers for feasibility studies. A detailed estimate follows the site walk.
Estimated build cost
$ —
Indicative only. Based on 2024–2026 Forgemont project averages, excl. land, sales tax and utility fees.
“Two hundred thousand square feet of tilt-up, zero lost-time incidents, and the racking contractor walked in on day one. That is rare.”
“Forgemont handed over our clinic eleven days early. The weekly site report meant our board never had to ask for an update.”
“Our house was drawn, permitted and built by one team. The number in the first estimate was within two percent of the final invoice.”
Bring us in at feasibility. Early contractor involvement typically saves 6–9% of the construction budget.